Hi,
I need to have the measurement created automatically for a PRT, which is used in the task list of routing, in production.
I have gone through the previous threads and checked the 'usage value formula' also. System is not creating measurement document when I confirm the production order. I am able to see the PRT usage value.
I am using ECC 6.0.
James Prabaharan