Upload of PIR in MD61 on weekly basis

Dear PP Experts,

I have uploaded the PIR in MD61 for the current month. I have done the following.

1. For the current month I have entered the Plan on weekly basis and for the next consequentive months I have uploaded the Plan on Monthly basis.

2. When I again check the same plan in MD63 for the same period of the current month starting with 01.06.2011 I am not able to see the first weeks plan which I have uploaded.

Also when I refer the BI report developed for the planed figures of the current month the first weeks quantity are not not appearing in the report as well.

This is because when I upload the plan on weekly basis system considers the plan on first date of every week. As a result, in case of first week for the month of June the start of the week is 30th May and the plan quantities are seen as requirement of May and not as requirement of June.

Can anybody tell me how I can load the weekly plan or is there any setting to be done so that when I upload the plan on weekly basis for the month of June it should remain in June and not in May.

Pl. let me know how this can be done.

Thanks in advance.

Regards,

Prashant

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jun 13, 2011 at 07:17 AM

    Hi...

    In this case you have to upload the PIR in MD61 on daily basis.

    E.g. if you want to put a requirement for the month on weekly basis put requirement on day 07th of the month and then 14th of the month and then 21st of the month and then 28th of the month.

    Iif you want to put a requirement for the month on monthly basis put requirement on day 30th of the month.

    And also do one setting in material master's MRP view1 field Maximum lot size:- Put one day production qty. This entry will restrict system to make different orders so that requirement will not move to previous month.

    Regards

    Vivek

    Add a comment
    10|10000 characters needed characters exceeded

    • In Forcast upload.,we have tcode md61,md62 and md63 .

      In our req, We have text file which we r passing to Zprogram to upload forcast. In this We want to update pBIm and PBED tables and we cn display forcast in MD63. Now standard sap program works and upload in Weekwise only even if we are passing Month Or day in our text file.

      It is using standard bapi "Bapi_requirements_create" to update PBIm and PBEd tables and den it will display in Md63 in Week wise only.

      Only thorugh bapi we can upload tables. Since it is standard bapi, we cannot make changes to it. and within the bapi itself they are splitting and converting to week and updating tables.

      Now, Is there any way we can upload the tables the way we want. that is either month or week or day.

      Is it possible thorugh Spro??

      And yes if we do it manually through MD62, we can get data in month or week or day wise format. So basically Manually it allows us to update data of our choice but sap standard program allows only week wise.

      Please suggest or or you can discuss with PP consultant.

      I tried copy bapi to zbapi but it is not possible as it gives many syntax checks..and other probs

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.