meter removal date is the same as date of estiamated reading, but readings are not the same. system does not take into account removal reading (22)
Example:
meter (XXX) reason 22 RR 01 date 20.01.2011 reading 1000
meter (XXX) reason 01 RR 03 date 20.01.2011 reeading 900
difference on reading 1000-900 = 100 is never billed.
is this contoled on custo?
where?