Skip to Content
0
Jun 09, 2011 at 09:40 AM

Stability study

208 Views

Hi gurus,

I am performing a stability study test.

I have created the inspection plan for the material with the following.

Usage 9 Material check

Status 4 Released (general)

Insp. Points Inspection based on samples

Dynamic mod. level at Char level

and assigned a Modification rule.

After i started creating the notification for the material in QM02.

Created the initial sample

Created inspection lot and UD taken.

specified storage conditions.

While creating the testing schedule it asks for maintenance plan.

when creating the maintenance plan in IP01 the following error message is coming.

"The physical sample 900000100 is not part of stability study"

We are unable to proceed further.

Kindly advice

Regards

Vinamrath