I need to initialize the set up table as some data(Initial load data) is missing in BW.

Steps:

1.Empty the BW delta queues on R/3 by extraction to BW

Load the delta data from R/3 into BW, so that the delta queue (transaction RSA7) no longer contains any data.

Initialization:

2.Delete the content of Setup tables (T-Code LBWG).

3.Fill the Setup tables

4.Stop Delta Process chain Schedule.

5.Run the Init InfoPackage.

6.Reschecule the Process chain.

Question:

1.Step 1, is optional right as delta is indepndent of Setup table?

What happens if we do not load in BW from delta queue? When is Step 1 Mandatory?

2.Any other steps to be followed?