Skip to Content
0
Former Member
Jun 07, 2011 at 08:54 PM

Iterative Calculations in Xcelsius

49 Views

I'm new to Xcelsius/ Presentation Design. I'm using a plant construction excel model to create front end dashboard. My model has a Interest during construction calculation (IDC) which is iterative. Basicallt the interest charged during the plant construction is also included in the capital. In excel I have formula iterations enable and this works fine, but with Presentation Design, this does not work. Do I need to enable iterative calculations in Xcelsius/ Presentation Design? If so were can I do this.

Any help on this matter is greatly appreciated.

Software:

SAP Crystal Presentation Design V 6.0 Build 14.0.0.760

Microsoft Excel 2010

OS: Windows 7

Thanks,

Arun