Hello Gurus,
Different material types are managed within one logical storage location (MM) which is assigned to warehouse number. The WMS structure provides different storage types where the different material types are managed. They are all WM relevant but should not be all WM-PP relevant, so, they should not be all Production Supply Area relevant.
Example 1: there is a production order with a component C1 put away in storage type Z01. A material staging is NOT done as not required. When a confirmation is posted, a consumption is done from the storage type Z01.
Example 2: there is a production order with a component C2 put away in storage type Z02 . A material staging is required and it is managed via a control cycle for WM production supply. Then it is posted a confirmation and a consumption is done from the storage type 100 Production supply.
My question is how can I manage both cases as an interfase is activated on warehouse numebr level?
Looking forward for your feedback
Kind regards
Jari