Hi Experts,
Client is in Discrete Manufacturing.
I have created the order type with PER settlement and created one production order with qty 23 with 3 operations.
operation 1 confirmed entire 23 operation 2 confirmed 13 as yield and 3 as scrap and operation 3 confirmed 9 as yield.
I could able to see the variance in KKS2 but not able to see the WIP KKAX, its showing as zero.
when i see in the Production order the target cost also showing as zero.
Kindly help me on WIP calculatiion as am in middle of discussions with business.
Thanks,