Hi,
I would like to clarify one thing. We have a DSO which serves a data source for two infocubes. One infocube is loading with delta through infopackages and update rules. The other cube has a transformation between the cube and DSO and we would like to initialize delta in DTP.
According to me the delta in DTP cannot affect the other delta loads, but we never had such scenario where there are BI7 and BW3.5 loads from one DSO.
I would be grateful if you can confirm me that this scenario will work. Since all the objects have a lot of data I don't want to mess up the already set up delta loads.
Points will be given to all answers.
Thanks in advance
Jan