Skip to Content
0
Former Member
Jun 03, 2011 at 07:47 AM

AltItem Group in BOM / Alternative Material

183 Views

Experts,

In Assy A I have two materials B & C in BOM, I like to route the demands to material B as long as I have enough material on stock. If I have no stock or not enough of material B to cover demands of Assy A, system should automatically switch demands to material C.

Is there a way to set this up in SAP, ideally with MRP support to calculate demands between B and C.

Thanks in advance

Jörg