Experts,
In Assy A I have two materials B & C in BOM, I like to route the demands to material B as long as I have enough material on stock. If I have no stock or not enough of material B to cover demands of Assy A, system should automatically switch demands to material C.
Is there a way to set this up in SAP, ideally with MRP support to calculate demands between B and C.
Thanks in advance
Jörg