Dear Colleagues,
We have to upgrade our BW 3.5 ABAP system to BI 7.0 EHP2 ABAP & JAVA system.
As per sap recommedation we are planning to have this system seperately and not has DUAL stack
We planned to upgrade BW 3.5 --> BI 7.0 EHP2 and then Install a new BI 7.0 EHP2 JAVA system and integrate both.
Is our strategy correct?
What are the steps to integrate BI 7.0 EHP2 java system with BI 7.0 EHP2 ABAP system ?
Regards,
Jai