Hi Gurus,
For material base unit is maintained as EA(Each) and Ordering unit is maintained as Carton (1 CAR = 12 EA).
In MRP
Reorder point is maintained as 5.
Maximum stock Level is 8.
I have 41(3.41 CAR) units are avilable in stock that is below reorder point.
I am running the MRP but no requirment is carried out.
Expected Answer : Requirment of 6 CAR = 72 EA should carried out.
Thanks in Advanced.