Hi All,
I have created a production order with 20 meter Square, when the cost is calculated in Production Order Balance Display system is showing below values
The BOM requirement is 0.464 Meter Cube, I have a query regarding confirmation
Origin Total plan Cost Plan qty
I100210224/MACH 166.7 1.667
I100210224/LABOR 83.35 1.667
I want to know how system is calculating Plant Qty & Total Plan Cost for Two Activity Type.
Regards,
Vivek