Skip to Content
0
Former Member
Jun 01, 2011 at 03:00 PM

parallel processes RFC Group

652 Views

Hi,

I´m planning to do a remote client copy via SCC9. But I´m not sure about the working of parallel processes. I´ve defined a RFC Group in the RZ12 but the different parameters are automatically introduced.

Activated (0 or 1) 1

Max. Requests in Queue (%) 5

Max. No. of Logons (%) 90

Maximum No. Separate Logons(%) 25

Max. Number of WPs Used (%) 75

Minimum Number of Free WPs 1

Max. No. of Comm. Entries (%) 90

Max. wait time 15

If I want to do the most faster copy via SCC9 I need to use the max number of WP avalaible, but I´ve need to leave 3 WP free It´s correct,this?

Then If I´ve 15 WP of DIA, for what the client copy uses the DIA WP I need to put in Minimum Number of Free WPs to 3 and in the paramater Max. Number of WPs Used (%) 75

How can I resolve this?

More thanks