Hi all
Is it possible in SAP to create a reservation for multiple material BOMs? I need to have the the required materials compute themselves. So for example I have 2 materials with different BOMs but have one similar material between the three of them
FG A
RM001 - 100 kg
RM002 - 20 kg
FG B
RM001 - 200 kg
RM003 - 40 kg
I need to to make a reservation with reference to the BOMs of FG A and FG B where the similar material is in one line but the quantities are computed for both FGs
The reservation should look like this
RESERVATION
RM001 - 300 kg
RM002 - 20 kg
RM003 - 40 kg
Please help