Skip to Content
0
Former Member
May 30, 2011 at 11:19 AM

Dunning in FICA

521 Views

Dear Experts,

I am having the requirement of dunning with 2 levels.

1. Number Of Days in Arrears ( 10 days)

2. Number Of Days in Arrears (20 days)

I have explained my requirement as an example:

I am having two open items with the due dates 01/03/2011 & 02/03/2011. When I am doing the dunning on 10/03/2011, 1st line item is considered.

Then when I am doing the dunning on 11/03/2011, both the line items are considered. As per my requirement 2nd line item should be considered. Unless if the line item is not eligible for the next level dunning system should ignore those open items.

If the open item is reached for last level, it should not consider in the next dunning activity.

I have tried my level best, small input also highly appreciated.

Regards,

Aswin

Edited by: Aswinkumar.V on May 30, 2011 1:34 PM