Production Order Type when converting a Planned Order

In customizing i can specify which type of production i want to create when i convert a planned order for in-house procurement. This selection is made by plant. Any one knows a way (maybe a user exit) how i can tell the system that i want a certain production order, depending on the Planned Order type? (PLAF-PAART i think)

For example, i want to create Prod.Order type ZP01 if the Planned Order Type is LA, or ZS01 when Planned Order Type is PR.

Prod Schd Profile allows us to define 3 Production/Process Order types (per profile), and that takes care of all the Planned Order types which will be created during MRP-run.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 27, 2011 at 12:30 PM

    Hi,

    Standard SAP allows you to define the order type for production order on the basis of Plant or MRP Group in MRPO group configuration.

    You can define addtional 4 order types in OPl8 based on MTS/MTO scenario.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 27, 2011 at 04:23 PM

    Dear,

    Please refer OSS Note 45664 - Order type determ., planned -> prod. order convers.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 30, 2011 at 05:37 AM

    Hi Sir,for yours requirement, please divides the all the materials based on the production order (Planned order) in a group.

    Than create a seperate production sechdule for each group of materails .Assign this to the materials masters in Work Sechduiling views.So whenever You run the MRP and click on Planned order for converting to production order by default it will convert to the required production order.

    In this what we have to do the is to maintain the Production Sechduiling profiles (OPKP) for each froup of material than you have to assigned this production sechduling profiles.Assign the production order to Production sechduiling profiles.

    HOpe so yours requirement will be meet

    Thx

    Bhupendra Singh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.