Dear QM gurus,
I have one inspection plan.There are 10 Characterestics in my inspection plan now i have one MIC called as X.I want to inspect that MIC only after completion of 10 days.Means on the 11 th day, 22, 33 day ....etc the MIC become active in Resut recording screen and i am able to record the result for that.For other cases it will become gray and does not allow for the result recorrding.I know that this is possible through dynamic modification rule but i dont know how to use it so please give me the guide line that how to use the dynamic modification rule and the Fields in it. In MIC it is selected that sampling procedure required.
Hence I try to assign DMR in insp plan it is asking sampling procedure and I am not able to assign DMR.
Please guide urgently.
Thanks.