Testing Product interchangeability with Location as MRP areas
created chain with new item as succssor product and old as the presecessor with DIRECTION --->FORWARD
After Running OPTIMIZER with Both the products and all Locations , OPTIMIZER is ordering new item and not the old item even though there is huge stock on hand of the old item.
please let me know if the optimizer will select new product irrespective of the old stock on hand.