Variable costs - KP06, KP26

Hi,

We have an interesting situation here - it seems as if when the user runs the KSPI transaction, it adjusts the total variable costs on the KP06 screen, and not the price on the KP26 screen, when the volumes are changed.

Now I can see the advantage for being able to do things this way, but do not know where to do this.

Have anybody seen the system behave like this?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on May 24, 2011 at 04:28 PM

    They are not changing the volumes by KSPP, but they are changing the capacity utilization, as well as the base qty on the master recipe.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.