Two Cost Element for the same GL

Former Member
0 Kudos

Hi,

We have 2 Company Codes - 1000 & 2000. We are using same CoA in both the Company Codes. We have a GL, say 12345678 for posting short/excess amount. So during MIRO, the accounting entry would be:

GR/IR a/c dr. 10,000

GL 12345678 2

Vendor 10,002

GL 12345678 would be dr or Cr would depend on short/excess amount.

We have created Cost Element for this GL 12345678. If I post the MIRO without attaching a Cost Center to this Cost Element system thows an error to attach the Cost Center. I have separate Cost Center for Company Codes 1000 & 2000 however I can only put one Cost Center in this Cost Element.

Can anyone advice how can I post the above mentioned entry with different Cost Center. This line item (GL 12345678) is generated automatically and the Cost Center field is greyed out hence I don't have option to enter the Cost Center during MIRO. I checked the FSG of this GL, Cost Center field is 'Optional' over there.

Thanks,

Sandy

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi,

For field status group of cost elements please restrict in OB41,

Naresh

Former Member
0 Kudos
  • Solution Option* -You can assign Differant Cost Centers to Company Code 1000 and Company Code 2000 in OKB9 Transaction Code.Follow the below process....

--- Go to OKB9

--- Select New Entries button

--- Give the Company Code 1000 in first row and 2000 in 2nd row

--- Enter the Cost element 12345678 for company code 1000 and 2000

--- Enter the relevent cost centers for company code 1000 and 2000

--- Select Save

Thanks

Fit 4 Nothing

Former Member
0 Kudos

Hi.

'I can only put one Cost Center in this Cost Element'-what you mean, okb9?

1. you can create divide PO item on two,

2. while posting miro divide this item for two cost center-click button Multi account assignments

Former Member
0 Kudos

Hi,

Assign the cost centers to your respective Cost elements in OKB9 T.code. by this when ever posting is done to the cost elements automatic postings will be done in the respective cost elements. Do not assgin cost center in the cost element master record by this Posting will be restricted to one single cost center.

Thanks

Goutam

Edited by: Goutam78 on May 24, 2011 4:04 PM