Skip to Content

lot creation after confirmation

In my in house production having with three operation

010 in house operation

020 external operation

030 in house final

i want to create a inspection lot after confirming second operation how to handle this scenario

if I go for 03 type inspection type it is creating with production order itself just I want to know is it possible to create after confirmation

With this external operation confirmation there is no gr is happening same material is going and same material only coming inside, with some work on the material

pls advice me

Faisal

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    May 23, 2011 at 09:03 AM

    Not possible in SAP standard for creation an inspection lot automatically when order confirmed if there is no GR.

    You can check process for an inspection lot creation manually at transaction QA01.

    Regards

    Luke

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    May 23, 2011 at 09:09 AM

    Operation wise creation of inspection lot is not possible that too for 03 inspection type.

    Add comment
    10|10000 characters needed characters exceeded