Hello All,

Today as per my routine i was performing daily tasks on PRD, and i found that the log backup which was scheduled has failed.

I tried to perform a log backup immediately and it didn't worked.

And to my surprise there are no logs to know what the error is and why is this happening.

Could anyone please tell me what the problem is and how to solve?

Thanks.

Regards,

Mudassir.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on May 23, 2011 at 12:25 PM

    Have a look on the SAP Note 1242278 - DB6: Status 'Scheduling failed' in planning calendar.

    Regards,

    Subhash

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Thorsten Zielke

      Hello Thorsten,

      I have checked all the files you have listed already but there was no sign of any error message which made me even more curious. Anyhow after posting here about the problem. I deleted the old scheduling of all the log backups and created a new template and then i assigned the new template to the future log backups scheduling. And it worked.

      Thanks for the note you mentioned its really informative and useful.

      I thank Mr Subhash and Mr Thorsten for your responses.

      Regards,

      Mudassir.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.