Hi we have the following issue in Kanban
We have a batch managed material (Material A) we want to use this kanban process.
The Kanban Control Cycle for Material A has 2 containers.
Material A has batch 1 and batch 2 in the warehouse.
We do not want to mix batch 1 and batch 2 in the same container.
When we request Material A we do not want to mix batches in containers.
Is this possible?
In tests when there is not enough qty of Batch 1 to fill container 1 SAP takes batch 2. This is not allowed here.
Thanks