Skip to Content
author's profile photo Former Member
Former Member

Configuration of material master idoc interface to RFID

Hi,

We are planning to have SAP RFID. Once operational, do we need to send SAP Material Master field data to RFID? For ex; when the description of a material is changed, do we need to send this new information to RFID system through Idoc (or some other way)?

Regards

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on May 23, 2011 at 04:57 AM

    Yes. This is available in SAP AII which is configurable. Material Idoc is the best way. Activate change pointers generally (Customizing for Logistics - General -> Supply Chain Planning Interfaces (SCPI) -> Auto-ID Backend Integration --> IDoc Processing --> Material Master Data IDocs -> Activate Change Pointers Generally).

    Hope this helps.

    Thanks,

    Naveen

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.