Skip to Content
author's profile photo Former Member
Former Member

How to Merging the two files using BPM

hi all,

i have a requirement like i have two pickup two files(both are same structure)after picking i have to do separate mapping for two files with target structure then i have merge two target files and sent it to target system using bpm.so plsese suggest the process(bpm design) and here i need to use correlation?

condition: i have to wait some time for second file to receive,if i didnot receive in particular time i have to raise alert.

Thanks,

Seshagiri.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Posted on May 12, 2011 at 10:38 AM

    There are some patterns in SWC : SAP BASIS --> namespace : http://sap.com/xi/XI/System/Patterns In ESR of your SAP PI System.

    check these scenarios (IP & Mappings) for collecting messages.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 12, 2011 at 10:48 AM

    Hi Sehsagiri,

    You can use any of the collect message pattern provided. In your case any one of the following can be used:

    1. BpmPatternCollectMessage

    2. BpmPatternCollectTime

    Let me suggest one more thing, you dont have to use two separate mappings. You can try this:

    1. Create a mapping.

    2. Go to mapping and then to signature, add the source and target and accordingly map the fields.

    This will enable two separate files as target to be mapped in a single mapping. Since the source structure is single this might reduce your complexity.

    Try this out once.

    Cheers,

    Souvik

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 12, 2011 at 01:03 PM

    Hi Seshagiri,

    Please go through the [Link1|http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/10526] [original link is broken] [original link is broken] [original link is broken]; and [link2|http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/10377] [original link is broken] [original link is broken] [original link is broken];where Merging of two files is explained using BPM(Correlation).

    Cheers!!!

    Naveen.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 12, 2011 at 03:54 PM

    Use BPMPatternCollectTime. As souvik mentioned, you don need to create separate mapping

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.