Skip to Content
author's profile photo Former Member
Former Member

Reg:Production Order confirmation

I have to do One operation

1) Created one workcenter -ABC with

Setup time=10min

Machine time=10min

Labour time=10min

In kp26 i have maitained price for setup,machine,labour time

NOw for that operation i have cretad a production order with qty=100.Nos

My actual values are

Setup time=20min for 1 piece

machine time=20min for 1 piece

Labour time=40min for 1 piece

In Co11n to confirm the production order

Yeild=100,

and for setup time,machinetime,labour time

1)should i enter actual values or the values mentioned in the workcenter

2) should i enter for 100 nos or for 1 number

Regards,

Raj

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on May 11, 2011 at 04:55 PM

    Hi,

    1)should i enter actual values or the values mentioned in the workcenter.

    Values you enterd in workcenter is probably a planning which may vary..so you have to go for

    actual values(u need to change the values which comes automatically if it does not satisfy your needs.

    2) should i enter for 100 nos or for 1 number

    the field "yield" signifies the operation cost on being produced material..ok.so whatever amount of material

    that had been processed under this operation,you need to put there that yield value only n the corresponding

    operation/activity amount n do the GI if u need.

    so in above case put yoeld 100.

    Please reply if any question

    Regards,

    DeJoy

    Edited by: de joy on May 11, 2011 6:56 PM

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Raj,

      you are entering the yeild as 100 qty, tht means the values for setup, Machine & Labour time should be entered for 100 qtys.

      else if u enter the values for 1 qty system wil consider it for 100 qty (as yeild=100 qty).

      Rgrds,

      Kapil

  • author's profile photo Former Member
    Former Member
    Posted on May 12, 2011 at 12:07 PM

    Hi,

    The times maintined in the routing are the planned values, which may vary in actual. some times considerably.

    When you are confirming the order it is recommended that you enter only actual values. These are directly proportional to costing.

    1)should i enter actual values or the values mentioned in the workcenter

    If your actual values are 20min, 20 min and 40 min, then maintain those values during confirmaton. But by default the system proposes planned values only, which you can change during confirmation.

    2) should i enter for 100 nos or for 1 number.

    you can maintain the number of quantities you want to confirm, there is no rule that you have to maintain order qty only. but make sure you maintiain actual time taken for producing those materials are maintained during comfirmation.

    In standard SAP

    setup time , machine time and labor time are considred for cost calculations.

    labor time is not considered for scheduling.

    Offcourse it depends on your need and accordingly you can define your own formulae for calculation.

    Pavan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.