Skip to Content
author's profile photo Former Member
Former Member

Material & Work Center assignment report

Hi All,

Is there any report in SAP which displays the assignment of Material (Child component of BOM) with Work Center.

If not, do let me know the table(s) from where i can check the assignments.

I have check the T.code CA80, COOIS & Table S022, but of no use.

Do revert.

Regards,

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    Posted on May 11, 2011 at 09:20 AM

    Dear,

    Assuming you have done the component allocation for the respective operation in the routing of the in house manufactured

    products,you can get the details along with the operation no, work center,component allocation through the report CA51,in the

    input screen ensure the check box for component allocation is checked and execute this report.

    Check and revert.

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 11, 2011 at 10:43 AM

    Hi,

    Check with COIO report where u can get Operations, resource and its assigment with control key and activity type details.

    Thanks & regards,

    Sampath

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2011 at 02:32 PM

    closed without solution

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 24, 2011 at 03:39 PM

    unanswered

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 25, 2011 at 05:03 AM

    Hi, please check the table MAPL, in SE16. Hope os yours requirements will be full filled

    Thx

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      You have to use PLMZ table for compoenent alloocation in routing.

      Somwhow you need to join MAPL(Routing)-PLPO( opeartions/work centers)-PLMZ( allocation to operation) tables.

      Alternative;ly try using CARO_ROUTING_READ function module in a Z program. This FM will return you the Compoenenta allcoation in a routing in a internal table along with operation number. It will be failry easy to relate the same with work center of operation.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.