Inspection Lot creation when COGI in REM

When there any errors (COGI) during GR-REM (MFBF), it is observed that system is not creating the inspection lot. can anyone help me explaning this behaviour

Thanks in advance

Regards,

Raghava

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    May 06, 2011 at 02:07 PM

    Hello Raghava,

    In the material master for the inspection type if in the Control insLot the setting maintained is an inspection lot for each material document item or an inspection lot for each material document and material or an inspection lot for each material and batch then the lot will be created with the material document .

    in other words creation of the material document will be the triggering point for lot creating for this setting . As during the goods movement error the material document is not created hence the lot is not created .

    I hope the information helps. Let us know if you need any further info .

    Cheers

    Kaushik

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Raghava S

      Hello Ragahva,

      If you have goods movement error during the GI (261 movement type ) then the lots will be created as the inspection lot creation is triggered by the goods receipt material document for the Control insLot 'each material document item'.

      Check whether the good movement error is in GI or GR ?

      Cheers

      Kaushik