Hi,

I have a service notification with maintenance plant AC01 (China), this needs to be changed to the maintenance plant AS01 (Singapore). The service order has already been created from the notification with correct maintenance plant AS01.The serivce order is released but not confirmed and there is not materials reserved.

The requirement is only to change the maintenance plant on the notification. The user is not having the authorisation to change it to AS01. Can I change it in production system directly using IW52 by taking change access?

If yes, what are the points to be taken care of? Please guide,

Regards,

SAM

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on May 06, 2011 at 02:03 PM

    hi

    you can change main work center even after releasing of service order in notification or service order in IW52. Ask your BASIS guy to give you authorization of IW52 and IW32 and change work center. If still system gives any authorization error then run SU53 and check which authorization is required and ask you BASIS guy to give your user that authorization.

    Please check and update the forum.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.