Skip to Content
author's profile photo Former Member
Former Member

Start program

Hi i tried to connect SAP PIto ECC using TCODE RZ70. I done the following things

Technical System

1. SAP R/3

Following is the procedure defined technical system for SAP R/3.

i. In RZ70 in ECC

ii. Entered the Host and Service with respect to the PI system

iii. Click Execute to transport the technical system to the PI system.

iv. The screen indicated the transport as "SLD DS Start program".

its shown as finally "1:cmperp_ECC event controlled job already exists, scheduling not neccessary."

V. In SLDCHECK it gives an error

" Summary : Connection to SLD does not work

=> check SLD function and Configurations"

Please help me what is this error how i can get rid of it and how to connect to PI system.

Solution will be highly appriciated.

Thanks.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 05, 2011 at 03:45 PM

    Hmm.. Sir's nobody to reply?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.