field to differentiate in house and subcontracting at prod order level

Former Member
0 Kudos

Hi gurus,

I have one requirement, Client wants to trace production at In-House and at Out-Source at prod order level.

that field should be available in CJ20N project/WBS line item level also.

how to incorporate this field/change/compulsory field in prod order and CJ20N also.

Thanks in advance,

K. Jeevan

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

I don't think there is a way to differentiate this on production order level, but it is possible on operation level. A mix of in house and subcontracting operations may be used as well. We differentiate these orders by using different production order types for these circumstances.

Former Member
0 Kudos

Hi,

It my client , we manufactured material in house and subcontracting also,

we make separate prod order for subcontracting material when we receive material from subcontractor and confirm that prod order

How we can find the at production order level, that the production order contains sub contracting or in house material??

Eg: prod order FG material: A contains SFG material: B (that SFG may be subcontracting or in house)

sundaresan_velayudam
Active Contributor
0 Kudos

In operation overview

based on control key you can differentiate that operation is in house or sub contracting

If you are using PPo2 for external operation

Then in COOIS

in operation you can filter out the data with respect to control key and save layout

there by you can analyse only the external operation

Former Member
0 Kudos

Query is very vague.

May I know what you mean by

trace production at In-House and at Out-Source at prod order level
that field should be available in CJ20N project/WBS line item level also.

What is it that needs to be traced ? If production order is specific to the project & indicated so in material master (MRP-4 view, indiv/ coll indicator), then the production order will contain reference to the WBS. Once completed stock will be posted to Project stock, so there is a link. Is this what you refer to?