To enable status FPLT-FKSAK in VA42 Billing plan for T&M

HI All,

In VA42 - Billing Plan, The Billing status is always A even if the bill is done. I have been assigned to change it to C when billing is done. This is happening in T& M only. For Fixed and Milestone, it s automatically closing. But for T & M it is not. Any suggestion ??

Regards

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on May 05, 2011 at 08:45 PM

    Yes - go back to the SD functional analyst and have them re-evaluate this. If the status is not changing then either something wasn't configured incorrectly or the correct process is not being followed.

    There should be no ABAP necessary to change any standard statuses in SAP.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.