Skip to Content

auto matic UD

Experts

What is the concept of automatic User decision concept in QM

If i want to bring this concept what are the setting required

Please give me a detail answer

Thanks in advance

Faisal

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 04, 2011 at 03:41 PM

    The concept of Auto UD is

    When you do not want manually go to QA32/QA11 & to carry out Usage decision every time ,then you can make setting for "Auto Usage Decision"

    I QM view inspection type there is provision of "Auto UD" & "SKip"

    Generally AUto UD is done for the lot

    1.for which result recording done & all char has status 5-->closed & completed.

    2.All char as "Skipped'

    for auto UD to set in background you need to

    1.for this plz. check in spro >Quality Management >Basic Settings >Maintain Settings at Plant Level >select plant >inslot completion >automatic usage decision --> Enter delay time for skip lot.

    2.In QA16 create the variant & in QA17 run the variant with schedule.

    or

    2.Use QA10 & make variant & Run Variant through SM37

    I hope this will help

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.