batch to batch transfer (same material)

HI experts,

I have a scenario where i have to post the X qty from batch B ( GRN in april ) to batch A (Grn In mar) for same material.

I have consumed the material from full qty from Batch A in April and the material from batch B remained unutilized.

Now i have to consumed some more material in the month of March . Period is still open.

What is the solution as i tried batch to batch transfer using 309 but error appears "Deficit of BA :Unresticted material".

What is the alternate solution for this?

Regards

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on May 04, 2011 at 07:22 AM

    if batch B was created in April, then you cannot move its stock in March, as you did not have any stock of this batch in March.

    Because of this fact, you cannot perform a transfer posting in one step.

    You have to use a 2 step movement, e.g. 201 to consume the batch B to cost center in April, and a 202 to unconsume this quantity with batch A in MArch.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.