Hello all,
is there a way to display actual cost line items for networks? I have tried the following ways:
- CJI3
- KOB1
When entering only the network number, the error message KB422 is displayed (No line items were selected). When entering the WBS number to which the network is attached the costs are displayed.
Any ideas? Thank you!
Regards
Christian
Hi Christian,
In CJ20N from the hierarchical structure-select the Network
->Edit
->Costs--->Itemization.
What data do you get there?The actual costs boprne out of activity confrimation would be reflected there.
Thanks and Regards
H
> When entering only the network number, the error message KB422 is displayed (No line items were selected).
There is no actual posting against the network exists.
When entering the WBS number to which the network is attached the costs are displayed.
after running double click the document number and check the account assignment whether it is to WBSE or to Network activity. It will clear your doubt.
Hello Abdul,
thanks for your reply.
When I drill down to the document number, this leads me to
- the actual data of the network confirmation (CO Business transaction RKL)
- the trip transfer documents (CO Business transaction COIN)
In both cases the network and operation are involved, not the WBSE.
Regards
Christian