Actual Overhead Calculation

when I executed actual overhead calculation for production order using CO43, actual overhead amount calculated is zero. Why it is so ?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on May 04, 2011 at 05:01 AM

    when I analysed a particular order using KGI2, material overhead % is 3%, condition value 233987.00 and material overhead calculated is 7019.6. has been shown under analysis. I saw the cost sheet rows as follows:

    Row Base overhead F.row T.row Credit

    10 B000 0 0

    20 MO01 10 10 XS01

    30 Mtrl Usage 0 0

    Does the above attribute to my overhead being calculated as zero ?

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 04, 2011 at 10:37 AM

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.