Actual Overhead Calculation

when I executed actual overhead calculation for production order using CO43, actual overhead amount calculated is zero. Why it is so ?

Add comment
10|10000 characters needed characters exceeded

2 Answers

  • author's profile photo
    Former Member
    Posted on May 04, 2011 at 05:01 AM

    when I analysed a particular order using KGI2, material overhead % is 3%, condition value 233987.00 and material overhead calculated is 7019.6. has been shown under analysis. I saw the cost sheet rows as follows:

    Row Base overhead F.row T.row Credit

    10 B000 0 0

    20 MO01 10 10 XS01

    30 Mtrl Usage 0 0

    Does the above attribute to my overhead being calculated as zero ?

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Ajay Maheshwari

      yes Ajay. Overhead rate is mentioned already.

      Now the figures are coming. I was told by the technical person that it was due to a system performance lag the figures were not coming.

      thanks

  • author's profile photo
    Former Member
    Posted on May 04, 2011 at 10:37 AM

    Thanks