when I analysed a particular order using KGI2, material overhead % is 3%, condition value 233987.00 and material overhead calculated is 7019.6. has been shown under analysis. I saw the cost sheet rows as follows:
Row Base overhead F.row T.row Credit
10 B000 0 0
20 MO01 10 10 XS01
30 Mtrl Usage 0 0
Does the above attribute to my overhead being calculated as zero ?