on 05-03-2011 7:17 PM
Hi everyone.
I´ve created a new regulation in GRC Process Control 3.0, after that I´ve programmed an automatic control using a rule and and it associated script.
The issue is that I want to modify that script but I can´t becuase of its assignment to the rule. This rule is being used by a scheduled job which starts the automatic control monthly. Thus, I have to delete the job in which is configured the control where the rule is assigned.
I have no idea if that job can be cancelled in the Portal, because I can see a Cancel button but it´s not enable.
Is it possible or shall I cancel that job using an ABAP transaction? In that case, which one?
Does anybody have a hint on this matter?
Thanks a lot in advance
Hi
I also want an answer to this question.
The jobs don't appear on SM37.
Kind regards,
Mashudu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
We have the same problem in GRC PC 10.0.
Although, I tried to cancel/delete the job in SM37, but it is still displayed in Monitor Scheduler NWBC.
Please, advise.
Thanks,
Cristina
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.