Hi all
I am trying to create a process chain that does a full load into an ODS and then a full update into the Cube. The full load and activate works fine, but I am having trouble doing a full update into the Cube.
When I use the "Update ODS Object Data (Further Update)" process type and in the process maintenance I chose the Full Package for Update by the ODS.
I get the following error message:
"Process LOADING variant ZPAK_XX is referenced but is not in the chain"
When I bring in the InfoPackage as a predecessor of the update I then get the following error:
"InfoPackage ZPAK_XX is generated; NOT able to be used as loading variant"
Is there another way to do a full update into the cube from the ODS?
Thanks in advance
Chami