cancel
Showing results for 
Search instead for 
Did you mean: 

Not possible to determine any components

Former Member
0 Kudos

Hi,

I am getting error as "Not possible to determine any components" in line item in PO. could some one help me to resolve this

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi,

if you not maintained Bill Of Material or creation of BOM date should not equal to delivery date in this case system will not determine the components.

please check in BOM or you can maintain by manually.

Answers (5)

Answers (5)

0 Kudos
former_member187989
Active Contributor
0 Kudos

Please search forum before posting,there are lot of answered threads.

Former Member
0 Kudos

For subcontracting PO, even in case the BOM not created, you can go ahead and maintain the components at Item details level --- MAterial data --- Components click the object list ---. and maintain the material with the required quantity.

S. Kumar

Former Member
0 Kudos

Hi,

Please refer to the note 715192

The requirement date of the components is always calculated as follows:

The planned delivery time (in calendar days) is deducted from the

delivery date, the resulting date is then converted (if necessary) to

the last workday before it and then the purchasing processing time (in

workdays) is deducted.

then

(*) Requirement date = delivery date - planned delivery time - purchasing processing time

-Delivery date is on Po item level

- planned delivery time in on MM03 view MRP2 of HEAD material

- purchasing processing time is on OPPQ

If at this date (*) the bom is valid ( trx CS03) then the system determines the components in subcontacting items.

otherwise you get error me154.

BR

Nadia Orlandi

kailas_ugale
Active Contributor
0 Kudos

Hi

r u creating subcontracting po useing item category L in po?

If you are creating subcontracting po then we have to maintain component of chield material which you are going to send vendor for subcontracting process,chek BOm is mainatin there or not ,If not maintain by t-code CS01

IF aleardy maintain then chek delivery date in po

Regards

Kailas ugale