Report showing independent requirements for several materials

Former Member
0 Kudos

Hi

Workiing in SAP 4.7

Looking for a report where I can see independent requirements over time, for several materials, based on a time characteristic such as month/week. So for example I want to see the independent requirements for 10 different materials in a list, with the time characteristic on the horizontal axis.

Is there any such report? I am NOT asking for MD05/MD06/MD61/MD62.

Thanks in advance,

Lars

Edited by: Lars Tornblom on Apr 27, 2011 10:09 AM

Accepted Solutions (0)

Answers (1)

Answers (1)

sundaresan_velayudam
Active Contributor
0 Kudos

Check in MD73

if you are using requirement plan then check based on requirement plan else check based on MRP controller by giving period