Wrong Schedule line getting created

Former Member
0 Kudos

Hi Friends,

When I am creating an order system is creating the schedule for the next day and not for the same day. I have material in stock, in my sales order the lead time is ZERO but still system is creating schedule for the next day.

Can someone please tell what could be the problem and the possible solution.

Regards,

Wasim

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi Mastan,

The transit time is ZERO. I check the shipping details in schedule line tab all the dates are same as the requested delivery date.

What I am looking for is when I run transaction VA01 the requested delivery date should come by default as the date of creation of SO and not the next day.

Please advice.

Regards,

Wasim.

Shiva_Ram
Active Contributor
0 Kudos

Check in t.code VOV8, for the sales order type, whether lead time in days is maintained and propose delivery date field is checked. This could also be a reason.

Regards,

Former Member
0 Kudos

Wasim,

Could you check the Route, What is the transit duration is aintained?

Please try to check the shipping tab in order overview screen and check the dates?

I assume that its because of transit time in the route which is taking as lead time..please check and let me know.

Regards,

SK

Former Member
0 Kudos

Wasim,

Do you have 3rd party for this SO ?

Mauryan

Former Member
0 Kudos

Hi JP,

The availability check is KP and in MRP2 the lead time is ZERO. Still i am facing the same problem SO created today but delivery date is of tomorrow.

Please advice.

Regards,

Wasim.

Former Member
0 Kudos

Wasim,

As correctly said by JP, check the MRP 2 view of the material master along with RLT in checking group.

Also if you have the shipments to be created u2013 then check the route has pick pack time, loading time and route schedule is activated.

Mauryan.

jpfriends079
Active Contributor
0 Kudos

Hello Wasim,

- In TCode MM02, Check Scheduling in MRP2 Tab of Material master (if MRP is active.)

- In Tcode OVZ9 - AvC control, for your Availability check maintain (eg. 02) in material & Checking Rule:A-SD order.

Whether Check availability without replenishment lead time is unchecked, as this Indicates whether, during the availability check, the system checks the replenishment lead time. So, Items for which the delivery date falls within the replenishment lead time, but for which there is no inventory, are confirmed for delivery after the replenishment lead time. In the case of items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be confirmed.

Thanks & Regards

JP