Here i am implementing activity based costing.here ps module is there.I created network activity in project level, i assigned workcenter, work hours and activity type in network activity level.But i am not getting any project plan and actual cost for project level in s_alr_87013543 t.code.My client wants to calculate the project cost.In production level i am capturing the plan and actual cost,But in project level i am not getting the any cost.Any body please help me.

Thanks & Regards,

Reddy

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Apr 25, 2011 at 08:59 AM

    Hi,

    1. Attach valuated material to activity and save to get planned cost

    2. For actual need to do procurement cycle for the material attached.

    Best regards,

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      This is completely internal activity cost caluclation.Here i am not given the material.How we can capture the internal cost in project level.

      Design is my network header.there is no any material for design.How we can capture the design plan cost.

      Regards

      Reddy

  • author's profile photo Former Member
    Former Member
    Posted on Apr 25, 2011 at 11:08 AM

    Hi,

    If internal activity cost is not getting calculated check following cost calculatation log:

    probable reason could be:

    -Activity price not maintained on the cost center of work center

    -Activity hours are not maintained in project

    - Control key config should allow costing.

    -Activity type master data are not correctly maintained.

    Rajesh

    Edited by: CA Rajesh Porwal on Apr 25, 2011 1:09 PM

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.