Skip to Content
author's profile photo Former Member
Former Member

Dont want to put the SLED during GR(MIGO)

Hello experts,

I have some materials in my plant ABC for which i dont want to enter the SLED(Shelf Life Expiration Date) during Goods receipt(MIGO).

But as the setting in SPRO has done at plant (ABC) level & movemnt type (101)level,System will always ask to enter SLED.

I want to avoid this.

Please help me on this.

Santosh

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Apr 22, 2011 at 08:37 AM

    Hi,

    Remove SLED fields from Material Master and check it once again.

    Regards,

    Prashant

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 22, 2011 at 08:34 AM

    I think this is just triggered by the shelf life fields in material master storage location view

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 22, 2011 at 08:47 AM

    Hi,

    If the batch all ready created then goto MSC2N transaction and maintained the SLED date, whenever you use the Batch system will automatically take the same

    Regards,

    Pramod

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.