Dual Scheduling

Dear Experts,

Without using SAP TM or TPVS, Is is "practically" possibpe to make transportation and shipment scheduling to drive loading date that in manner is "locked" at some point relative to e.g. current date based on simultaneous availability of material of means of transport. I am not steadfast on doing an ATP check to evalaute MAD again and again but its like driving an alternate MAD and hence loading date based some external date (which is more expensive to miss) that is implicity dictating the loading completion date at a warehouse..of course subject to some "feasibility".

I understand this is not standard but the desired bevaiour of changing dates (loading, planning, mad, delivery) is well understood and does have a strong business case.

If I was not clear but this sounds familiar somehow and you are keen on answering, I can elaborate the complete context.

Regards,

Loknath

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Apr 21, 2011 at 02:23 AM

    Errata

    simultaneous availability of material AND means of transport

    "practically" possibLe

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.