Hi All,
Is there a possibility to have SAP automatically change the Sample Inspection lot % defined in the Sampling procedure based on some pre-defined rules. Lets say for instance a Vendor has continuously provided materials with defective quality. The Sample % set in the Sampling Procedure is currently 10%. This now needs to be increased to 20%. Is there a way for the system to determine that this needs to be changed and do so accordingly based on some rules.
Regards,
Imran