on 04-20-2011 8:03 AM
Hi,
When i am sending a idoc from ECC to PI, for empty field it is sending "/" a forward slash and a blank.
How i can remove this in PI or ECC.
Thanks & Regards,
Vishal K
Hi Vishal,
You can remove the "/" in mapping step in PI.
In mapping, use replaceString function and replace the "/" with null value as required.
-Supriya.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
>>>How i can remove this in PI or ECC.
1. PI in the mapping
2. ERP in the output IDOC exit
remember
/ for SAP is something different then an empty field (/ is empty and empty may remove the field's content in ERP)
Regards,
Michal Krawczyk
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.