Skip to Content
author's profile photo Former Member
Former Member

how to remove "/" from the idoc empty field

Hi,

When i am sending a idoc from ECC to PI, for empty field it is sending "/" a forward slash and a blank.

How i can remove this in PI or ECC.

Thanks & Regards,

Vishal K

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Apr 20, 2011 at 07:47 AM

    Hi,

    >>>How i can remove this in PI or ECC.

    1. PI in the mapping

    2. ERP in the output IDOC exit

    remember

    / for SAP is something different then an empty field (/ is empty and empty may remove the field's content in ERP)

    Regards,

    Michal Krawczyk

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 20, 2011 at 08:15 AM

    Hi Vishal,

    You can remove the "/" in mapping step in PI.

    In mapping, use replaceString function and replace the "/" with null value as required.

    -Supriya.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.