Configurable General Maintenance TaskList

Dear Team,

I am working on Configurable General Maintenance TaskList but unable to get success. Requirement is Client is having No of equipments like : Crane, forklift. Some are Diesel Dirven, Some Petrol Driven. As per SAP guidline I am trying to map the Configurable general maintenance Tasklist for the same. Requirement is with the help of single tasklist only, only diesle ralted operations should come for Diesl driven equipments, which I have maintained in Equipment with the help of charcterstics. Same for the others.

Regards,

SAP PM

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    Posted on Apr 20, 2011 at 04:40 AM

    Create characteristic vehicle_type

    char value PETROL, DIESEL

    Create a class with class type 300

    Assign vehicle_type in char

    Maintain Dependency in CU01

    Dependency type - Selection condition

    sel condition vehicle_type='DIESEL'

    another dependency

    sel condition vehicle_type='PETROL'

    Note: these dependencies to be applied in the task list operation

    Create the Equipments

    Assign the class

    Maintain PETROL or DIESEL in vehicle_type

    Create General task list IA01

    Enter the operations

    Assign dependencies to evey operation

    Extras > Object dependencies> Assignments

    Create configuration profile for general maintenance task list

    select general maintenance task list

    enter profile name

    Assign the class

    dont enter diesel or petrol

    Last

    Create a maintenance order

    go to extras --> direct entry

    select general task list radio button

    give equipment, group and group counter

    a screen characteristic value assignment will be opened

    select PETROL or DIESEL

    the operations will be selected related to PETROL or DIESEL

    Hope this helps

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 19, 2011 at 11:30 AM

    Hi,

    Can you mention where you are failing?

    Have you created object dependecies in the operations of your tasks?

    Best Regards

    Kannan G

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 19, 2011 at 11:37 AM
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 20, 2011 at 03:42 AM

    Please go through the last part (by ALFREDO PEDROZA) of the following thread:

    [Configurable tasklist steps|configurable-general-task-list]

    Also see this link:

    [Configurable Tasklist Integration test|http://www.scribd.com/doc/7347726/Configurable-Task-List-ECC6]

    Regards

    Jogeswara Rao

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.