We need to have purchase requisitions created in MD04 only for the vendor delivery days. I.e) if a vendor delivers only for 3 days in a week then we need to have purchase requisitions created only for the 3 days for the in MD04. please advise...,

Thanks....

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on May 05, 2011 at 07:47 PM

    Hi,

    You can trigger this by using the correct MRP settings (lot size key "PK") in conjunction with a correctly set planning calendar you are able to have the MRP generate purchase requisitions based on the required dates.

    Planning calendars can be set in customizing SPRO->Production->Materials requirement planning->Master data->Maintain planning calendar.

    Edited by: Peter Pallen on May 5, 2011 10:28 PM Lot size key added

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 05, 2011 at 07:56 PM

    Kindly goto MD25 and craete weelday specific planning calender and check days proosed by system and please used Consumption base planning for this purpose

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.